The purpose of this consultancy is support training for and carry out site assessments of 44 Primary Health Care (PHC) facilities suitable for Solar energy in Guyana, to determine the energy needs of the facilities and infrastructural information which will provide information to plan for solar PV installation project at the PHCs in the country. The general objectives of this consultancy are to: 1. For Five (5) Health facilities - Site assessments and solar energy designs: Conduct an energy demand assessment for all defined HF - Collect energy needs data from PHCs suitable for solar energy based on the template designed for the assessment, collect infrastructural condition and site layout details to inform on solar PV installation plan. Evaluate the technical, logistical social, and security conditions for implementing solar solutions in each facility. Determine the optimal solar capacity and define the main equipment. Develop a specific design for large health centers and a standard design for small ones. Define the budget and operation and maintenance (O&M) strategy. Expected Results: Detailed excel template (consist of HFSE assessment using ODK Collect and HFSE equipment tool) filled containing energy needs and infrastructural information for each of the 5 health facilities. Photos per facility organized by the Facility Name. Organized and properly named photographic record for each healthcare facility. Sizing and design of each Solar Photovoltaic Solution SSFV for each large healthcare facility: location of solar panels and connection equipment, complete solar design for large healthcare Centers, including: SSFV sizing in kWp, battery Ah sizing (if applicable), roof analysis (feasibility for solar panel installation), AC and DC wiring routes, connection point, selection of inverter or inverters, SSFV monitoring. Selection of main equipment and technical specifications (panels, support structure, cabling, inverters, batteries, and cabinet). General plans for equipment location in the facility and detailed cabling route plan. Complete budget in USD including total cost of goods and services for each SSFV. Standard sizing for small health facilities: Define the best location for each SSFV. Focus on the condition of the roof and access. Group health Centers into a maximum of four groups based on energy demand and similar conditions, location, surface area, among others. Standardize the design (standard design) of the SSFVs and define for each one: Solar capacity kWp, Number and capacity of panels kWp, Number of inverters kW, Number of batteries (if applicable) and capacity Ah. 4. General plan: general location, building layout (main electrical board) and location of the SSFV. General budget in USD including all goods. General Operation and Maintenance (O&M) strategy for future SSFVs, recommendations based on field reviews and analysis. Summary Presentation of key findings and recommendations of sites: capacity, budget, beneficiaries. 2. For thirty-nine (39) Health facilities - Training and site assessments: 2.1 Provide training, follow up, and manage the information that will be collected by health personnel for health posts. 2.2 The health personnel will collect energy needs data from health posts suitable for solar energy based on the template designed for the assessment 2.3 The health personnel will collect infrastructural condition and site layout details to inform on solar PV installation plan. Expected Results: 1. Detailed excel template (consist of HFSE assessment using ODK Collect and HFSE equipment tool) filled containing energy needs and infrastructural information for each of the 39 PHC facilities. 2. Summary Presentation of key findings and recommendations of sites 3. Photos per facility organized by the Facility Name. - The UNICEF Latin America and Caribbean Office (LACRO) will provide online training to the selected consultant on the use of tools so that the consultant can multiply the training sessions. - The consultant must provide in-person training sessions in Regions 1 and 9 in at least 3 groups per region, as well as online training, continuous monitoring, guidance, and serve as data manager for the information collected by healthcare personnel. - The consultant should not visit the planned health posts only the five larger health facilities where they will conduct Site assessments and solar energy designs. UNICEF Guyana seeks to engage a qualified contractor/firm to support training and conduct site assessments at 44 PHC facilities suitable for solar energy in the country. The list of sites is attached as Annex 1 with this TOR. UNICEF aims to complete training and assessments of all 44 PHC facilities within 8 - 12 weeks for which contractor should engage multiple teams simultaneously to cover the assessments within the allotted timeframe. The site assessments will be carried out based on the template, attached as Annex 2. This template already includes all the parameters deemed necessary to be collected from the sites that will allow UNICEF and future solar PV system suppliers to size the solar PV system and estimate the material required per site. The detailed services required under this assignment are: Coordinate with UNICEF and counterparts on the adjustment of the tool and ensure assessor participation in the training workshops. Collect Health facility level data using the template attached as Annex 2: Develop the sizing, design, budget, and operation and maintenance strategy for health centers. Provide training, guidance and follow up to the health personell for the 39 health posts. The company will use the prepared Site Assessment Template to collect information from the health facilities. Please see link for template. The template may go through revision and updated based on the feedback from the selected contractor. The key points for data collection are All collected data will be submitted for each facility to UNICEF in digital Excel format All required photos will be submitted in jpeg or similar format organized in folder named after the facility name. Before the visit: Socialize the project: Emphasize the request for support in gathering the most reliable field information. Validate that they are operational. Request preliminary information: electricity bills (for HC connected to the grid), available floor and land plans, and the total population served by the HC's area. Coordinate the presence of the following staff from the HC on the day of the visit: The current person in charge and a person who has worked there for at least the last 5 years and knows the Health Center's history. The following type of information will be collected: Site/Infrastructure Assessment: Facility profile: verify the existence of the health facilities at the provided location, basic information, GPS coordinates of the facility, etc. Record the names and contact details of key facility personnel and local government officials with a stake in the healthy functioning of the facilities Building layout (dimensioned plan), structural condition, physical infrastructure integrity and suitability for the installation of solar PV system to power the facility and community receptivity, electrical power distribution system, etc. Determine the network connectivity situation and level of mobile phone service (voice/text only, GPRS, 3G, 4G, none) at each facility (to determine if remote monitoring technology can be deployed at the site) Describe the operation activity of the facility, including the operating hours, etc. Describe the current level of functionality of the facility (fully functional, partially functional, etc.) and highlight key constraints to functionality (medicine, vaccinations, water supply, electricity supply, etc.) Record the number of rooms, list the potential / earmarked electrical equipment per room and the expected daily usage pattern of electricity Record the average number of patients/days, no. of beds, services provided, etc. for health facilities – these can help estimate the size of the system and the needs in terms of equipment use, mobile phone/device charging Grid power availability (facilities and community), quality (reliability), connectivity arrangements, plans for grid supply in the community Other additional assessment, as necessary. Detailed load assessment of the facilities (or kW requirement) to meet the existing and future demand for improved service delivery, including but not limited to the following: The current electricity needs of the facility and future needs depending on any planned upgrades to the facility. Identify the types of services and associated electrical appliances that are deemed highest priority for current needs and future upgrades. Stock-take of existing energy consumption at facilities (including electricity via diesel generators, batteries, or other means, and the use of any liquid or solid fuels). This stock-taking should: List electrical appliances present at the site, their Wattage, and hours of usage in daytime and night-time Describe the current source of lighting and electricity and how it is perceived in terms of reliability and service quality. Provide photographs of existing lighting sources (e.g., candle, kerosene lamp, battery-powered torch, etc.) and/or any existing electricity source (e.g., diesel generator or solar system). Record the age of the existing diesel generator (if any), cost of installing the energy system and the average energy expenditure (per month) on the different energy sources, and O&M costs. The amount of downtime due to lack of fuel budget or generator being out of order If one or more solar PV systems already exist, record information regarding their specifications (1) A picture of the solar panel specifications 2) Total number of panels, number of panels in series, and number of series in parallel. 3) Inclination and azimuth of solar panel array 4) calculated PV array peak output voltage, current, and power (wattage) (if available). 5) charge controller size and type. 6) battery size, type, age, and typical depth of discharge 7) battery inverter/variable frequency drive/3-phase inverter size and type (if used)) and typical usage profile Record data on refrigeration used (model(s), size, and nameplate data). If the refrigerator is powered by a separate solar electric system, record solar panel peak Wattage (Wp) For other equipment already powered by solar, length, terms, and conditions of the operation and maintenance contract, age of the system, battery life, etc. Identify loads not suited to being powered from a solar PV system All the above points are already included in the questions in Template attached as Annex 2. A summary presentation is to be prepared with key findings across all facilities and recommendations on implementing solar PV systems in these facilities. The contractor, at their own expense and risk, may use electrical energy consumption measurement equipment such as a datalogger or network analyzer to refine their analysis. Energy Efficiency Considerations: The contractor must recommend implementing potential Energy Efficiency measures at each facility. They should prioritize these measures based on a cost-benefit analysis, focusing on: 1. Equipment that consumes the most energy, 2. Technological obsolescence, and 3. Passive measures in buildings. These measures will be proposed for the entities to implement prior to the installation of the Solar Photovoltaic Solutions (SPVS) to achieve greater efficiency in the use of energy from the solar solutions. Just for the PHC with scope: Site assessments and solar energy designs: Sizing and Design of Solar Photovoltaic Solutions (SPVS): Based on the information collected in the field, the general sizing and design of the SPVS must be developed, considering the following scope: Sizing and design of each SPVS for each large health facility: This should include, but not be limited to: -Sizing of the SPVS in kWp - Sizing of the battery in Ah (if applicable) - Roof analysis (viability for solar panel installation, validate access for maintenance). If the roof is not suitable, define the optimal space on the ground, ensuring it is unshaded and has the possibility of being enclosed and secured. - Definition of AC and DC cable routes and connection point to the main electrical panel of the facility - connection conditions. - Selection of the inverter or inverters, and SPVS monitoring. - Selection of the main equipment and technical specifications (panels, support structure, wiring, inverters, batteries, and enclosure). Budget: A general budget in USD must be prepared for each of the proposed SPVS for each facility, detailing the quantity and cost of the main equipment: itemized panels, itemized inverters, itemized batteries (if applicable), itemized support structure, and a general global item for the enclosure, wiring, protections, fencing, etc. This includes supply, transportation, installation, and taxes. For all PHC: health centers and health post: Prepare site plans for each facility: Three plans must be presented for each facility: 1. A general aerial view plan (which can be created from satellite information like Google Maps) highlighting the general location of buildings and available spaces. 2. A general layout plan of the main buildings, highlighting the location of the electrical service entrance, the main electrical feeder, and the distribution panel. And 3. A site plan that identifies the location for the installation of the solar photovoltaic panels and the appropriate location for the installation of the controller, inverter, and batteries, as well as the connection points to the main panel and the estimated cable lengths from the main grid to the solar panel. Operation and Maintenance (O&M) Strategy: Based on the consultant's observations in the field, experience with these types of solutions, the capabilities of the health facility staff, the resource management considerations of each entity and the Ministry of Health, the technical specifications of the equipment, and the technical, social, and cultural conditions, the contractor must propose an optimal general operation and maintenance strategy for the SPVS. This strategy should guarantee: 1. The continuous operation of the SPVS, 2. The execution of preventive and corrective maintenance, and 3. The correct administration and sustainability of the infrastructure to ensure its longevity. This deliverable is essential for establishing the investment and operation conditions of the assets to be built and thereby managing the mobilization of funds that will allow the project to be materialized in the near future. A summary presentation will be prepared for each facility with the key findings at all installations, recommendations on the implementation of solar photovoltaic systems at these facilities, sizing, budget per facility and total, and O&M considerations. UNICEF Guyana Ministry of Health Ministry of Loca Government and Regional Development UNICEF Health HQ NA Deliverables # work days Nov 2025 Dec 2025 Jan 2025 Deliverable 1: Preliminary assessment Conduct preliminary site assessments at 5 PHC facilities. Submit the collected data in excel format with site plan layouts and photos arranged in folders per site Develop the sizing, design, budget, and operation and maintenance strategy for health centers. 10 x Deliverable 2: Complete training, guidance and assessment for 39 health posts. Conduct training for 39 PHC facilities. Submit the collected data in excel format with site plan layouts and photos arranged in folders per site Summary presentations with main findings and recommendations, O&M strategy of sites. 40 x Total days: 50 *** Materials under this assignment are the property of UNICEF. ***UNICEF needs to approve deliverables prior to moving to a next phase. Duration of assignment: 60 days Start date: 10 November 2025 The Contractor will report directly to UNICEF Guyana’s Health Team in coordination with colleagues from the Ministry of Health and UNICEF Health RO/HQ. A technical and financial proposal should be resubmitted by the contractor by 2 November, 2025. The technical and financial proposals should be submitted in separate envelopes. No financial information should be included in the technical proposal. Below is a list of items that should be submitted in the separate technical and financial proposals. Technical Proposal should include the following long list to be decided by the Country Office: Company Profile Document & registration documents List of previous similar project undertaken Minimum 3 reference from previous clients (UN agency or other international organisations if available) Methodology Workplan for implementation of the contract Team Composition CVs of all proposed team members Electrical installations work or electrical surveys/inspections carried out in previous 3 years Solar PV installations work carried out in previous 3 years Financial Proposal should include the company’s costs associated with implementation of the TOR, including technical fees, transportation, accommodation, per diem for company staff. Please note that venue for the trainings and transportation, accommodation and per diem for the training participants will be covered by UNICEF and should not be included in the financial proposal. Bidders are expected to submit a budget in excel format (using formulas) of the lump sum financial proposal to complete the entire contract based on the terms of reference. UNICEF does not provide transport, accommodation, insurance or other logistical support for the Suppliers’ staff and all costs should be included in the lump sum financial proposal. These lines of communication and liaison will remain open for regular contact throughout the assignment, and staff will remain available to assist and participate in the assignment as necessary or appropriate. Ultimately however, the institution is expected to have the self-sufficiency to work independently. The company should consist of a team of full-time individuals who will be coordinating directly with the Health Team at the UNICEF. The applicants should have a combination of technical skills of both solar PV installations data collection and electrical wiring. Fluency in English amongst the team overall is a must. To finish the assessments of all 44 PHC facilities within the allotted timeframe, the company should propose multiple teams; with qualified team members not less than 2 in each team. Graduate in any stream but preferably Electrical/Civil Technical Background: with soft skills of data collection, assessing infrastructural condition, electrical condition, and electrical health equipment. Also, to check quality of the existing wiring and determine the needed material for adequate electrical wiring for the PHCs Experience of assessors: Knowledge of health equipment functioning and purpose Knowledge of in electrical and solar works Knowledge of infrastructural assessment Minimum 5 years’ experience in delivery of similar services Relevant Degrees from Quality institutions Experience in MS Excel Experience in using Smartphone Solar/Electrical Technician or Engineer: will be responsible to survey the PHCs and collect all the relevant energy and ideal installation location information according to the template All other proposed personnel should have qualifications and experience applicable to the position that they are being proposed for. The proposed personnel should also have to capacity to collect and organize data effectively.
Log in or create an account to view complete details for this procurement opportunity
If you need support, please email us at [email protected]